The latest list of Item Codes is available from HQ Woven Stabilization and Separation Geotextiles, - Dimensions & Weights for EcoTubes Geotextile Dewatering Tubes, - Dimensions & Weights for EnviroGrid Cellular Confinement, - Material Safety Data Sheet (MSDS) - Drainboard, - Material Safety Data Sheet (MSDS) - Stratagrid, - Material Safety Data Sheet (MSDS) - Envirogrid, - Product Advantages of EcoTubes Geotextile Dewatering Tube, - Product Benefits of EcoTubes Sludge Dewatering Tubes, - Product Benefits of US Fabrics' Foundation Drains, - Product Benefits of US Fabrics' Sheet Drains, Design/Installation Guidelines; Applications, - Comparing Old Style & New Style - Strata Geogrid, - French Drain Exterior Foundation Install, - Geogrid & Welded Wire Form Inside Corner Placement, - Installation Guideline for Separation Heavy Geotextile, - Installation Guideline for Separation Medium Geotextile, - Sheet Drain Exterior Foundation Install, - Theoretical Tube Volumes & Dewatering Capabilities, - Typical Cross Section - Vegetated Reinforced Soil Slope, - Equivalent Products for Composite Drains, - Volumes & Dewatering Capabilities for EcoTubes Geotextile Dewatering Tubes, - Geogrid Quality for Finished Product and Raw Materials, - Use Woven Geotextiles Instead of Geogrids, - Municipal Waste Water & Water Treatment w/ EcoTubes, - SRW (Segmental Retaining Wall) Drainage. Start by choosing whether your patio is a **single rectangle** or if it has a different shape, in which case you. Benchmark inspection of sampling and testing of rocks. If extensive slope protection problems are anticipated or encountered during construction, refer these to the design engineer and the project manager, who may in turn obtain the advice of the Caltrans Bank and Shore Protection Committee.. Use 5 to 7 st 1 0 obj The Standard Specifications provide two methods of placement for this type of protection: Method A and Method B. These supersede the previous Caltrans Riprap Sizes. Intermittent inspection of placement of slope protection, slope paving, and fabric operations. 8 0 obj 1. Place a highly permeable and appro-priately sized geotextile filter fabric on the prepared slope following the manufacturer's recommendations. All items. 0000002044 00000 n
{.sAewh[w#Iv#W6f" $JOPf/W%%XKK&A~b ?nfY_iu"m]HDwP) Rp Your search for great running gear starts and ends with us. EZw5'dr=`j+2\8:U.|V,%)~h/X8ps Mirafi 160N is a lightweight nonwoven geotextile that meet AASHTO M288 Class 2 geotextiles for separation and subsurface drainage. Note any changes that may have occurred between the preliminary design studies and the start of construction. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. PsVPvCHWTxml4N,P>{Ur]JBV:V,iVkNm(C d3@p/J3O//.cji-+TA3 dsU)~Ds:mp7=h&X#0C]\:k`#+VW^`0
0=F5VvL(^f Temp. Slope paving is a broader term that covers a variety of methods for paving slopes, including colored slope paving, exposed aggregate slope paving, and slope paving with concrete pavers. Keep records up to date. GHnBc__'h1'u]SO0P+R&yGeJ$FP?cSp28
1}9AQ #T6Bc*)_vU"]T hY# Rock Slope Protection Fabric, used in slope stabilization projects (see Technical Note on Rock Slope Protection / Rip Rap) When required by the Project Engineer, a Certificate of Compliance for each type of fabric being used should be issued by the supplier and furnished to the Engineer. For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. More simply put, if it is made of fabric and buried in the ground it is probably a geotextile! US Fabrics is proud to serve the geotextile needs of the State of Califronia, including: Los Angeles, San Diego, San Jose, San Francisco, Fresno, Sacramento, Long Beach, Oakland, Bakersfield, Anaheim, Santa Ana, Riverside, Stockton, Chula Vista, Fremont, Irvine, San Bernardino, Modesto, Oxnard, Fontana, Moreno Valley, Glendale, Huntington Beach, Santa Clarita, Garden Grove, Santa Rosa, Oceanside, Rancho Cucamonga, Ontario, Lancaster, Elk Grove, Palmdale, Corona, Salinas, Pomona, Torrance, Hayward, Escondido, Sunnyvale, Pasadena, Fullerton, Orange, Thousand Oaks, Visalia, Simi Valley, Concord, Roseville, Santa Clara, Vallejo, Victorville, El Monte, Berkeley, Downey, Costa Mesa, Inglewood, Ventura, West Covina, Norwalk, Carlsbad, Fairfield, Richmond, Murrieta, Burbank, Antioch, Daly City, Temecul and all other areas of California. Our TerraTex brand offers full-spectrum performance delivery - groundwater filtration and drainage, soil separation and reinforcement, geomembrane protection, sprayed liner substrate, oil-and-gas industry drilling pad and access-road enhancement, as well as pavement overlay and bond-breaker applications. Mirafi 1100N, 1120N and 1160N are heavy weight nonwoven geotextiles for more severe or extremely harsh conditions, such as rip-rap and revetment applications. The finish surface must be roughened by brushing to expose rocks. <> At TenCate ourgoal is your success. 4 0 obj uuid:bc193511-b4f2-4d99-b47d-5ec173dc2f21 When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. The chart below lists US Fabrics' geosynthetics meeting CALTRANS specifications. Source: Caltran Highway Design Manual, Chapter 870 Test panels may be specified in the special provisions. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. Resident engineers should be familiar with the material contained in Chapters 870, Bank ProtectionErosion Control, and 880, "Shore Protection," of the Highway Design Manual. Contact your local TenCate Geosynthetic representative for the proper use and specification of these products. When exposed aggregate slope paving is specified, ensure any concrete set retarders are used in accordance with manufacturer instructions. Fabric used for rock slope protection, temporary construction roadways, separation, stabilization, reinforcement, drainage, and erosion control. 0000012187 00000 n
0000014254 00000 n
stream or call (You may enter part of the word or the whole phrase). AASHTO is typical mass of 4.1 sy/oz.. Soil Stabilization Matting - Channel Application, Perm. Type R. Use stones between 50 and 250 lb. The concreted-rock slope protection method is used where large rock is not economically available in large quantities, yet a heavy, service type of protection is required. Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . =w
(j($M/!bMbo,iDjQL1{L! Protection involves constructing a heavy mass of smaller rocks bound together by concrete. 72-2.02B Fabric Fabric must be RSP fabric that complies with the class shown in the following table: 72-4 SMALL-ROCK SLOPE PROTECTION 72-4.02 MATERIALS Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. % rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) /OP true endobj The contractor must also ensure the construction of adequate returns and keys at the ends. TenCate develops and produces materials that function to increase performance, reduce costs and deliver measurable results by working with our customers to provide advanced solutions. Rock Slope Protection practice is intended for slopes too unstable for revegetation practices alone. For measuring concrete or shotcrete, refer to Sections 4-90, Concrete, or 4-53, Shotcrete, of this manual. Copyright 2023 TenCate Geosynthetics Americas. Slope Protection consists of rock, concrete, or concreted rock or slope paving ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE Stability: Angular shapes may be used on any planed slope Durability: Resist degradation and have a durability of 52 minimum (Caltrans) Consistency: Product is the same load after load. endobj XYo[unHCih,(~
t@K{
y.EmvKhy?_\F6.nO?iV5FlD,#t~J7z@Al.z_ooA=H
/$Q-Aav. /Filter/FlateDecode in a MS Word document format from the C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. For Type R, F, or Common stone riprap, provide Type 2 filter fabric when shown on the plans. cIP=L
?L-o'OfE;9'WgIBdysw>vOo#g 8L3f*7Mnd*3cdLy&v~;6s8;)9Q"SE8a+3/>svm^}+7Ea8IG01nY5y7mxJ]X9sGjv][ppYdv r=0EVPTO(Xam
-j9 WYY5:F"l9o&l:dyg^0GXoZgm[\H2#RrlXpZd`CAlwE.Sz.BuTiqT;E@m3I~`km&yeF Geosynthetic Bond Breaker (Call for product. Use the size and composition of yarn that is recommended by the fabric manufacturer. /Type/ExtGState If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. . Intermediate, or B dimension (i.e., width) where A dimension is length, and C dimension is thickness. Check to ensure that slopes and foundation areas are graded and compacted to specified tolerances. TAR_%R5Wa%*x4ux-x5d1c
iU:v9b!KXGcFK 1fN2 t K! Mirafi 135N, 140NL and 140NC are lighter weight versions of Mirafi 140N . Temporary structures shall be left in place until adequate vegetation and the permanent . The equilibrium soil-to-geotextile system that allows for adequate movement of a liquidin the plane of the geotextile over the service lifetime of the application. Close observation is required during rock placement to detect any damage to the fabric. Review the plans for the location and number of weep holes. IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN Verify the types of measurements and records necessary to support payment for the work. This handbook includes new and revised details for the various practices that are used in the development of erosion and sediment control plans. Review Section 4-90, Concrete, of this manual for details about concrete production. are available to meet BABA (Build America, Buy America) requirements. 3 0 obj the contract cost database using the most recent year of data. On a cut slope, this could be due to . They are designed to protect against raveling-type rockfall that involves small-volume slope failures (up to about 7.6 m3 or 10 yd3) or blocks up to 1.5 m (5 ft), depending on the strength of the mesh used (Muhunthan et al. C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 Technical Support available for assistance. At the terminals of protection, ensure the contractor is particularly careful to avoid erosion and undercutting. When rock slope protection fabric is required for either method, ensure the contractor places the fabric before placing the rock slope protection. Civil engineers and landscape architects need proven solutions to control soil erosion, stabilize slopes, enable drainage and create a visually pleasing landscape. 4-7203C Small-Rock Slope Protection The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Click on the product name for a data sheet. 6 0 obj Other Names Rock Slope Protection. Obtain rock samples for acceptance tests. {s9y^ 0000000928 00000 n
:t4NV]j{/mtqF*sx[%M
5%(/%(Z-F|[atK5[~{a~EwDCV:/#K)f~7*RsAnnJa>Jg-m^>\V7EOG3o?nGYIFze/l( I!&VXo]mm#7I0:EK7_LFwek com routes make excellent running trails for serious runners and casual joggers, alike. The contract plans will designate the required rock layer thickness for each location. L Earth Compacted Fabric Engineering 6'' 1'-0'' centers Staples at 6'' 2'' 6'' (Rock Splash Basin) TYPE 4 1 2 (Rock Slope Protection) TYPE 5 Staples at 12 inch centers. The heavier fabrics provide more strength and are less likely to tear when large class II or Class III boulders are placed on them. The method is particularly adaptable to locations where high-velocity flow is not detrimental, but desirable, and the hydraulic efficiency of smooth surfaces is important. Consult engineer to ensure applicable design requirements are met. 2 0 obj Also, ensure the contractor does not drop rock into place; otherwise, cracking or breaking may occur. (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. RG12N Nonwoven Geotextile with a 300 lbs grab tensile strength and a flow rate of 65 gallons a minute per square foot. "QamV(Z3VL> 1, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. If the rock layer is shown as 7 inches thick, comply with grading shown in the following table: If the rock layer is shown as 5 inches thick, comply with the grading shown in the following table: If the rock layer is shown as 4-inches thick, comply with grading shown in the following table: Granular material must contain at least 90 percent crushed particles when tested under California Test 205. <> To compensate for the lack of flexibility in the completed structure, ensure an adequate foundation lies below this type of protection. requirements. 0000009682 00000 n
The maximum height of the vertica l lower portions 3.5 feet. Broken-concrete slope protection consists of placing broken concrete from job site locations identified within the contract. State-furnished materials and expenses, as well as supplemental work items and descriptions. Observe construction to ensure the contractor does the placing, finishing, and curing as specified. Click on a heading to sort by that heading. Ensure concrete is cured by one of the specified methods. %PDF-1.3
%
Review contractors verification of unit weight of rock-filled gabions. Shop Lowe's for solutions to control erosion on slopes, as well. When evidence exists that the foundation depth is inadequate, obtain both the design and hydraulics engineers concurrence with a change order to deepen the foundation. Slope protection is usually needed to protect the upstream slope against erosion due to wave action. 1, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. Take care not to tear the filter fabric during installation. 2019-07-30T13:44:04-04:00 If the fabric is joined by stitched seams, stitch with contrasting colored yarn. The best slope protection type for a given situation depends on the conditions where the installation is to be made, availability of protection material, cost of the various types, and protection desired. (800) 518-2290, Providing the most comprehensive geosynthetic lines in the industry. . <> There are three material gradation requirements based on required rock layer thicknesses. Decide whether an adequate number has been provided for the particular installation. Riprap is typically placed along graded ditch, channel, and shoreline banks over geotextile, which prevents erosional undercutting. construction contract standards page. 0000007029 00000 n
Check the area to be protected to ensure that the required expansion joints are in place. Center splash basin . 2019-07-30T13:47:33-04:00 %PDF-1.4 The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. Transportation Specifications Section 96-1.02I for Rock Slope Protection Fabric, Class 8, nonwoven geotextile. Complete the Patio or Walkway 6. For details about concrete production, review Section 4-90, Concrete, of this manual. The bid item list and plans will specify which type of slope protection is to be performed. rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . A geotextile is typically defined as any permeable textile material used to increase soil stability, provide erosion control or aid in drainage. endobj Weight will vary based on density of rock available for the project. >> This section provides guidelines for inspecting slope protection for work specified under Section 72, Slope Protection, of the Standard Specifications. Chapter 4: Construction Details, Section 72: Slope Protection, Direction of flow and angle of impingement at various water stages, Capability of adjacent soil types to resist erosion from wash and eddy currents. Retaining Walls & Slope Stability 2, METHOD B) (TON) (ENGMET), ROCK SLOPE PROTECTION (NO. Rock grading and quality requirements per Standard Specifications. If your 20'x10' patio is to have a 6" base, then you should excavate a total area of 21' (20' +6" +6") by 11' (10' +6" +6"). When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed in Section 4-7203A, Rock Slope Protection, of this manual. For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. Method A is used where the stability of the rock slope protection is considerably dependent on the manner in which the individual rocks are placed. %PDF-1.4
%
For details about concrete production, review Section 4-90, Concrete, of this manual. endobj It consists of a layer of very large stones interlocked together and acts as a barrier on slopes that are unstable because of seepage problems or in areas that are receiving a large concentrated flow. The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed under Section 4-7203A, Rock Slope Protection, earlier in this section. Otherwise, placement could result in what is known as rockers or unstable rocks. main search page where you can specify additional parameters. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. The contract will identify the designated method. 0000012468 00000 n
The samples will be crushed in the laboratory to sizes needed to perform tests. 0000015681 00000 n
The color shall be black unless otherwise specified in the contract documents. Vegetation (see . Geotextiles. To better control the contractors selection of rocks for placing, ensure the contractor paints tonnage on large rocks used in foundation construction. 0000014231 00000 n
You may be trying to access this site from a secured browser on the server. When changes are made, maintain records of details, depths, heights, and other dimensions, and enter these on the as-built plans. Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. conforming to the requirements of 710-03 Vinyl Coated Steel Fence Fabric, Class A Wire Diameter, except color. (see Riprap Slope Protection Worksheet). Properly designed and planted vegetative covers play This translates to a 0.75H: 1V incline and is shown below. Barrier Landscape Edging & Paver Edging 6'/8. << K@^9t% OZ$Mb Ne#^/_*Zw;*T_]k. The challenge was to construct a new taxiway over areas that were built on tidal flats and land reclaimed from Boston Harbor. Ensure existing shrubs and trees are protected so that they continue to anchor the surrounding soil. Natural Resources & Energy Infrastructure, Energy - Power Generation - Renewables - Solar, Energy - Power Generation - Renewables - Wind. item code description; 729012 rock slope protection fabric (class 10) 729011 rock slope protection fabric (class 8) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) Before construction of any type of slope protection, review the plans, Standard Specifications, special provisions, any pertinent preliminary test data, and the location of the installation. Without proper slope protection, a serious erosion problem known as "beaching" can develop on the upstream slope. endobj <>/Metadata 7 0 R/OpenAction 8 0 R/Outlines 110 0 R/PageLayout/SinglePage/PageMode/UseOutlines/Pages 11 0 R/StructTreeRoot 137 0 R/Type/Catalog/ViewerPreferences<>>> Angular shaped rock may be used on any planned slope. 0000002336 00000 n
The Maryland Department of the Environment (MDE)recentlyadopted the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control. For measurement and payment, do the following: Chapter 1 - Caltrans Construction Organization, CalOES: Power Outage and Fire Recovery Resources. In 2007, the FAA approved construction of a new center field taxiway (Taxiway Mike) to alleviate airfield congestion. /Length 5601 Slope Protection consists of rock, concrete, or concreted rock or slope paving, ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE, THE PLACEMENT METHODS DESIGNATED BY CALTRANS, ADVANTAGES OF USING RIP RAP OR STONE PROTECTION FROM WILSON QUARRY (AROMAS), Make certain of the Product RequiredProject Service Requirements, Specifying Agency (Caltrans, Green Book, Army Corp or Other), Special Provisions addressing additional specifications, Certification Required (Submittals) Caltrans, Army Corps, other agency or engineer, Quantity Required (Specific GravityConversion Tons to Cubic Yards), Product Availability (Available when required, can handle Daily Shipping Requirements), The Reputation of your Supplier and their Products & Services, 100% Crushed Granite (Provides Superior Stability and Durability), Many different Rip Rap types available:All Caltrans Classes and Sizes, High Daily Production and Shipping Capacity (Can Handle Large & Small Jobs), Graniterock can provide delivery to your jobsite if desired. We're available on the following channels. /OPM 1 <>/XObject<>/Properties<>>>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. >> <>stream Erosion Control Blankets Wattles help slow water runoff and reduce soil erosion. DM[2TI=lGQx7
UoFK1: V;39LFOr7LxPF{BL3he6X^@v[QhWiF!l3F)
RTIBfx0.T F%n3h80Q,`[2xa%VLP /WD@j rK .9{N[#o/Fad#OK6YeqsyHl2M)V]/Nf(V?!1Oaw)fM 8JG)31m. The equilibrium soil-to-geotextile system that allows for adequate movement of a liquid across the plane of the geotextile with limited soil loss over the service lifetime of the application. Place a layer (six inch minimum) of endobj Enter the item description of the code you wish to search for: Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO.